Editing duration of a repeating task does not affect future occurrences

Avatar
  • обновлен
  • Исправлен

I am changing the duration of a repeating tasks to 30min but this only changes the current instance, not the future ones, which are remaining set at 15min. I do not have the option to "edit only current instance" (something like that) checked.

App:

Как Вы оцениваете обслуживание, которое получили?

Оценка удовлетворенности от melcontreras28 8 лет назад

Добавьте комментарий о качестве обслуживания (необязательно):

Avatar
Aymeric Founder
  • На рассмотрении

Do you have the little repeating symbol on the task you have edited?

Avatar
melcontreras28
Цитата от Aymeric

Do you have the little repeating symbol on the task you have edited?

Yes. What I am thinking is that maybe because I had so many duplicate repeating tasks because of the bug that was happening before that maybe the reason they don't change is because they belong to a different "series". I hope I explain myself well. I think I will delete all repeating tasks and create new ones to make sure the ones there are all linked together and I can be 100% sure they belong to the same series...

Avatar
Aymeric Founder
  • Исправлен

Closing this item. Feel free to reopen if this error still exists.